| ActivityType | Non-Notified (Working Days) | Limited Notification (Working Days) | Public Notification (Working Days) |
| Discharge from Bulk Material Proc | 31 | | |
| Discharge from Lge Scale Burner | 35 | | |
| Discharge from Sml Scale Burner | 33 | | |
| Discharge from Animal Efflnt Spread | 51 | | |
| Discharge from Spraypainting | 23 | | |
| Discharge from Other Indust/Trade | 27 | | |
| Install a Bore/Gallery | 9 | | |
| Cables/Pipelines | 27 | | |
| Stockpile Effluent/Organic Waste | 45 | | |
| Install/Remove a Culvert | 35 | | |
| Discharge of Solid Agrichemical | 16 | | |
| Discharge of Contaminated Water | 30 | | 352 |
| Deposition of Material | 26 | | |
| Disturb Bed | 37 | | 365 |
| Discharge of Stormwater-Industrial | 23 | | 134 |
| Discharge of Stormwater-Residential | 38 | | 206 |
| Discharge of Water- Pure | 42 | | |
| Earthworks | 27 | | |
| Discharge of Dairy Effluent | 54 | | |
| Discharge of Human Effluent | 27 | | 263 |
| Discharge of Other Animal Effluent | 52 | | |
| Excavate Material | 39 | | |
| Excavate Gravel Long Term | 8 | | |
| Take Groundwater | 38 | 190 | 165 |
| Hazardous Substances Storage Abv Grnd | 38 | | |
| Introduce Plant | 50 | | |
| Moorings | 36 | | |
| Construct/Remove a Structure | 37 | | 158 |
| Dam Surface Water | 37 | | 152 |
| Divert Surface Water | 35 | | 152 |
| Take Surface Water | 36 | | 139 |
| Use Surface Water | 65 | | |
| Clear Vegetation | 39 | | |
| Works to Divert Water | 30 | | |
| Works for Maintenance/Protection | 34 | | |